Mildren Construction, Portsmouth Dockyard
Scope
This project involved the installation of thermoplastic road markings to a newly installed tarmac surface in Portsmouth Dockyard.
The scope of works was the installation of the parking bays, give way, roundabout, disabled bays and hatchings.
All works were installed to a very high standard and the client was very satisfied.