Glaxo Smith Kline, Worthing
Project Overview
The supply & install of thermoplastic car park markings to an existing tarmac surface.
Installed works included installing a roadway, pedestrian crossing panels pedestrian walkways and directional arrows.
All works completed on time and to specification.
![](https://coupeline.com/wp-content/uploads/2021/12/30.jpg)
![](https://coupeline.com/wp-content/uploads/2021/12/186.jpg)
![](https://coupeline.com/wp-content/uploads/2021/12/29.jpg)
![](https://coupeline.com/wp-content/uploads/2021/12/30.jpg)
![](https://coupeline.com/wp-content/uploads/2021/12/27.jpg)