H2-GO – Hydroblast Road Marking Removal in Brighton
The Project
The hydroblast truck was booked to remove a temporary Pride Pedestrian Crossing in Brighton.
The hydroblast removal process with captive blasting and simultaneous vacuum recovery was ideal for the job due to the high public use area.
The needle-sharp water jets quickly removed the preformed thermoplastic to return the road to a blank canvas.